A) |
INDUSTRIAL BUILDINGS |
| |
|
All works cited in
our Reference List below has
been completed in compliance
to the PROJECT, CONTRACT and
TECHNICAL REGULATIONS at the
designated quality, meeting
WORKFLOW deadlines. We
obtained WORK COMPLETION
DOCUMENTS following FINAL
DELIVERY. |
|
| |
|
|
|
|
|
|
|
 |
1) |
SARKUYSAN ELEKTROLİTİK BAKIR SANAYİ ve TİCARET
AŞ. |
Gebze-KOCAELİ |
| |
|
ELECTROLYSIS
- 41 ADDITIONAL REINFORCED
CONCRETE KUV TANK AND
PLATFORM CONSTRUCTION |
2006-2006 |
| |
|
R&D
BUILDING CONSTRUCTION |
1999-2000 |
| |
|
MANAGEMENT BUILDING CONSTR. |
1998-1999 |
| |
|
MULTIWIRE HALL EXPANSION
CONSTR |
1998-1999 |
| |
|
COGENERATION
BUILDING CONSTR |
1996-1997 |
| |
|
COPPER PIPE INSTALLATION
CONSTR. |
1997-1998 |
| |
|
WIRE DRAWING
PLANT 1ST PHASE CONSTR AND
OTHER BUILDING WORKS IN ITS
VICINITY |
1995-1996 |
| |
|
FOUNDRY MACHINES BASING
CONSTR |
1994-1995 |
| |
|
QUALITY STEEL PLANT CONSTR |
1994-1995 |
| |
|
ELECTROLYSIS
EXPANSION CONSTR |
1992-1993 |
| |
|
WIRE DRAWING NORTH ANNEX AND
WATER TANK CONSTRUCTIONS |
1991 |
| |
|
WORKSHOP AND WAREHOUSE
CONSTR. |
1990-1991 |
| |
|
FACTORY ANNEX CONSTR. |
1986-1987 |
| |
|
EMBEDDED WATER TANK
CONSTRUCTION |
1984-1985 |
| |
|
|
|
|
|
|
|
 |
2) |
ENTEK ELEKTRİK ÜRETİMİ AŞ. |
Demirtas - BURSA |
|
|
a) BURSA COGENERATION
POWERPLANT STEAM TURBINE
BUILDING CONSTR. |
2005-2006 |
| |
|
b)
ALİAĞA TÜPRAŞ
PLANT POWER ISLAND BUILDINGS
and MANAGEMENT BUILDING
FINISHING CONSTR. |
2006-2007 |
| |
|
|
|
|
|
|
|
 |
3) |
TÜRK DEMİR DÖKÜM FABRİKALARI A.Ş |
Bozüyük-BİLECİK |
| |
|
BOZÜYÜK
PLANT 2ND SECTION BUILDING
CONSTRUCTION |
1977-1979 |
| |
|
Second part construction
works of 12500 M2 modular
carcass factory buildings
and 6000 M2 reinforced
concrete Managerial and
social building,
transformer, warehouse,
water tank, septic tank
constructions. |
|
| |
|
|
|
|
|
|
|
 |
4) |
T.ŞİŞE VE CAM FABRİKALARI |
Yalıköy-KIRKLARELİ |
| |
|
YALIKÖY
FINE SAND SIFTING PLANT |
1983-1984 |
| |
|
YALIKÖY
2ND DRAINING SILO CONSTR. |
1988-1990 |
| |
|
|
|
|
|
|
|
 |
5) |
GÜVEN PLASTİK SAN.ve TİC.AŞ. |
B.Çekmece-İSTANBUL |
| |
|
FACTORY
ANNEX CONSTR. |
1998-1999 |
| |
|
|
|
|
|
|
|
 |
6) |
PETKİM PETROKİMYA AŞ.YARIMCA KOMPLEKSİ |
Yarımca-KOCAELİ |
| |
|
CHLORINE ALKALI PLANT BRINE
TANKS AND SALT STORAGE
BUILDINGS AND EMERGENCY
WAREHOUSE CONSTRUCTIONS |
1981-1984 |
| |
|
|
|
|
|
|
|
 |
7) |
PRESİZ METAL İMALAT SANAYİ AŞ. |
Tuzla-İSTANBUL |
| |
|
1ST AND 2ND PLANT EXPANSION
CONSTRUCTIONS |
1975-1976 |
| |
|
5000 m2
plant expansion construction
consisting of reinforced
concrete pillars an steel
frame construction and a 500 m3
septic tank construction. |
|
| |
|
|
|
|
|
|
|
 |
8) |
ŞAHİN KİMYA ve ARITMA SAN.AŞ. |
Kullar-KOCAELİ |
| |
|
KARTONSAN
PURIFICATION PLANT CONSTR. |
1985-1986 |
| |
|
|
|
|
|
|
|
 |
9) |
BEKTAŞ BAKIR EMAYE KABLO SAN ve TİC.AŞ. |
Gebze-KOCAELİ |
| |
|
1ST
AND 2ND PLANT EXPANSION
CONSTRUCTIONS |
1984-1988 |
| |
|
|
|
|
|
|
|
| |
10) |
TÜRK HAVA YOLLARI A.O |
Yeşilköy-İSTANBUL |
| |
|
ENGINE OVERHAUL SHOP STEEL
HANGAR CONSTR. |
1976-1977 |
| |
|
OVERHEAD CRANE MAINTENANCE
PLATFORM AND FIRE ESCAPE
STAIRWELL CONSTR. |
1982-1983 |
| |
|
SHOTPEEN -
MEZZANINE AND ve DC10 BRUN DOC
CONSTR |
1983-1984 |
| |
|
ENGINE TEST BLDG |
1986 |
| |
|
|
|
|
|
|
|
 |
11) |
OTOSAN OTOMOBİL SAN.AŞ. |
Kadıköy-İSTANBUL |
| |
|
HANGAR
BUILDINGS AND CONCRETE
PAVEMENT, FIELD CONCRETE
CONSTRUCTION |
1975-1977 |
| |
|
|
|
|
|
|
|
| |
12) |
PAŞABAHÇE CAM SAN.AŞ. |
Beykoz-İSTANBUL |
| |
|
REINFORCED CONCRETE CHIMNEY
AND KILN BASINGS CONSTR |
1984-1985 |
|
|
|
|
|
|
|
|